How do you take care of a new Diamond Brite pool?

After the finish is exposed, let it air dry for as long as conditions will allow. Delaying the fill water a few hours or until the next morning will reduce the occurrence of shade variations (Mottling). Care must be taken not to over-dry the plaster and cause shrinkage cracking.

>> Click to read more <<

Thereof, how do you start a pool for the first time?

Regarding this, how soon can I fill my pool after plastering? One the plaster dries out; you need to fill the pool with water. The plaster material cures under water in about 7-10 days. But this doesn’t mean you have to wait that long. Once the pool is filled and clean, you can go in for a swim.

Also, can you wax over Diamond Brite?

You can simply wax over it though and the wax will become the outer protective layer on the car. A pure wax (eg not a cleaner wax) shouldnt remove it, but obviously if you clay, polish and use paint cleaners in future you will.

Is Diamond Brite worth the money?

diamond brite is just a sales money making product, there is loads better stuff on the market loads cheaper that does the same job and easier to apply if you do it your self, you can pick the Dimond brite stage 1 and two up from ebay for around £6 and do it yourself.

How long after Diamond Brite Can you fill pool?

Note that the application of Diamond Brite is a two-day process. The average pool takes 24 to 36 hours to fill. Until the pool is completely filled with water it is vulnerable and extra care should be taken as detailed below. It is important that your swimming pool be filled with water as soon as possible.

What is the most popular Diamond Brite color?

Common colors for Diamond Brite pools include Cool Blue, Onyx, Ivory, Oyster Quartz, Aqua Quartz, and Verde. However, our favorites are Tahoe Blue and French Gray.

How long does it take for Diamond Brite to cure?

Allow BOND-KOTE to cure for at least six (6) hours before plastering. The plaster should be applied to BOND-KOTE within three (3) to five (5) days. If left for a longer period before the finish is applied, ensure Bond Kote is clean and free of dirt, efflorescence, and other contaminants.

Leave a Comment